Traffic Update
Cargill is expanding and widening Kuther Road through August, which means you’ll notice increased traffic in front of the NKP Main Campus.
Please allow a few extra minutes when arriving and use caution when entering or exiting campus.
What to Expect
- Increased truck and construction traffic on Kuther Road
- Slower travel during peak arrival and dismissal times
- Normal access to the NKP Main Campus remains open
Please Drive Safely
As always, the safety of our students, staff, and visitors is our top priority. Please:
- Slow down when approaching campus.
- Watch for buses, pedestrians, and increased traffic.
- Follow all posted signage and directions from campus personnel.
Refer to the map below for the affected area.